Skip to content

Housing,reimagined.

Vessel designs, manufactures and constructs the future of multifamily housing.

Scroll

The American housing crisis isn't a lack of desire. It is a failure of process.By unifying design, engineering, and construction, Vessel makes housing scalable, affordable, and predictable.

Engineered once,built anywhere.

Vessel Calypso exterior in white
Flat-packed Vessel Calypso panels arriving on a flatbed under Vessel tarps

Engineered once,built anywhere.

Vessel Calypso exterior in white

Engineered

Already built, permitted and lived in, so the hard problems are solved up front.

Flat-packed Vessel Calypso panels arriving on a flatbed under Vessel tarps

Produced

Structure and wall panels are made in our factory while your foundation goes in.

Assembled

Vertical construction takes about six months, with local trades and inspections.

Living room inside a Vessel Calypso home

Modern apartmentsbuilt to be lived in.

Build , at , and every year after.

Hover a phraseTap a phrase
A Vessel Calypso going up in New London
About six months of vertical constructionVertical construction on Vessel projects to date has typically taken about six months from the top of the foundation. Conventional midrise buildings often take 12 to 18 months. Your schedule depends on your site, approvals and foundation work.
Panels arriving flat-packed on a flatbed
Typically 10 to 30% below conventionalTypical range for Vessel’s scope against conventional construction in the same market. Your price depends on your site, configuration and location, and is fixed in your contract before you break ground.
Inside a Vessel Calypso home
A fraction of the usual operating costBased on Vessel’s operating benchmarks against institutional comparables. Results vary by property, market and operator.

Underwrite your site.

Enter an address to see what fits, how many homes it holds and how it pencils, in minutes.

Discover what you canbuild with Vessel.